Monday, October 20, 2008
Friday, October 17, 2008
Beton pillars and belt
The four beton pillars and the concrete belt has been finished.
The roof-structure starts in three weeks.
The roof-structure starts in three weeks.
Posted by
Érkeserűi Református Egyházközség / Chesereu Reformed Church
Labels:
event
Saturday, October 11, 2008
The walls are standing
The walls are standing. Next is the beton pillars and the belt.
There will be chimneys also for hard times... and untill central heating will be mounted. Anyway, stoves are the best...
Bricks in the outside and weight-carrying walls, at least until the window level. The rest is of mudbricks.
The entrance before the living room. The two rooms to the right, behind them is the kitchen. At the end: bathroom, storage room and the room for the future central heating... Or another storage room?
Posted by
Érkeserűi Református Egyházközség / Chesereu Reformed Church
Labels:
event
Friday, October 10, 2008
"Friday School"
Because of the constructions and lack of room in our congregation, we have to keep our Sunday school Bible-studies in the local school-building on Fridays. We are thanking to the local school for accepting us inside their building, although they are also in the middle of renovation and having problems with classrooms.
Posted by
Érkeserűi Református Egyházközség / Chesereu Reformed Church
Labels:
event
Bricks + mudbricks
Posted by
Érkeserűi Református Egyházközség / Chesereu Reformed Church
Labels:
event
Subscribe to:
Posts (Atom)