With the help of God and of the local authorities we could cover th roof with new tiles. All the other isolation works follow next year by the providence of God.
Tuesday, December 23, 2008
The roof is ready
Posted by
Érkeserűi Református Egyházközség / Chesereu Reformed Church
Labels:
event
Wednesday, November 26, 2008
The roof is under construction
Posted by
Érkeserűi Református Egyházközség / Chesereu Reformed Church
Labels:
event
Monday, October 20, 2008
Friday, October 17, 2008
Beton pillars and belt
The four beton pillars and the concrete belt has been finished.
The roof-structure starts in three weeks.
The roof-structure starts in three weeks.
Posted by
Érkeserűi Református Egyházközség / Chesereu Reformed Church
Labels:
event
Saturday, October 11, 2008
The walls are standing
The walls are standing. Next is the beton pillars and the belt.
There will be chimneys also for hard times... and untill central heating will be mounted. Anyway, stoves are the best...
Bricks in the outside and weight-carrying walls, at least until the window level. The rest is of mudbricks.
The entrance before the living room. The two rooms to the right, behind them is the kitchen. At the end: bathroom, storage room and the room for the future central heating... Or another storage room?
Posted by
Érkeserűi Református Egyházközség / Chesereu Reformed Church
Labels:
event