We have unloaded the soil outside the walls and leveling the floor with balast. Soon we will isolate and concrete the floor.
Thursday, September 11, 2008
Preparations for the floor
Posted by
Érkeserűi Református Egyházközség / Chesereu Reformed Church
Labels:
event
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment